Ohio data center moratoriums & entitlement directory

As of Nov. 18, 2026, Ohio has 161 data center moratoriums or bans on record as in force, including 9 double-coded and confirmed by a government record, an official notice or two independent news outlets. 10 more are proposed or scheduled for a council vote, and 6 earlier pauses have expired or been replaced by permanent zoning rules. Nationally, 76% (56 of 74) of data center moratoriums that reached their initial sunset date with a recorded outcome were extended. Treat every stated expiration date below as the earliest possible catalyst window, never as a guaranteed reopening date.

Updated Nov. 18, 2026Part of the Moraine US Data Center Moratorium Register

in force (12 bans)
161
double-coded and confirmed
9
proposed or vote scheduled
10
in force with a planned project inside
2

Geographic map: in-force and pending Ohio restrictions

  • Dark red: in-force restriction on a government record or in the press.
  • Light red: in-force restriction reported on industry tracker lists, pending primary-source confirmation.
  • Yellow: ordinance formally proposed or scheduled for a council vote.

Hover over any county or municipality for its current legal status; click for enactment and sunset dates, vote tally, ordinance text and source, where on file.

Showing Ohio only. Pick another state in the panel, or open the national tracker. Open the full-screen tracker →

Exposed pipeline: pre-construction campuses inside Ohio pauses

This ledger lists only pre-construction pipeline projects: a documented utility power request, land-use application, entitlement approval or building permit, with vertical construction not started. Operating campuses and sites under construction generally hold vested approvals and are excluded.

  • Red text: projects without an initial land-use approval.
  • Jurisdictional note: a county instrument lists every planned project inside the county boundary, including sites inside incorporated municipalities that may hold their own zoning authority.
  1. 2 planned projects

    Springfield city · 2 planned
    Crusoe Energy Systems LLC/Crusoe Cloud Holdings LLC data center (City of Springfield, Clar, The Constant Company, LLC data center (City of Springfield, Clark County)
    Double-coded; not headline-eligible

  2. 1 planned project

    Washington township · 1 planned
    Cmh051 (0125064021)
    Double-coded; not headline-eligible

Upcoming catalyst calendar (next 90 days)

  1. Niles city · Stated expiry · Source

  2. Braceville township · Stated expiry

  3. Howland township · Stated expiry

  4. Williamsburg township · Stated expiry

  5. Sunbury village · Stated expiry · Source

  6. Maumee city · Stated expiry

  7. Hubbard township · Stated expiry

Complete Ohio instrument ledger (181 tracked actions)

Sorted by legal status (in force, pending, concluded). Each record displays its verification tier, including 99 in-force rows resting on unconfirmed tracker leads, published so they can be checked in diligence. Legislative status is never inferred: “Not stated” means no primary document or press report we found gives a sunset date.

Data center moratoriums and bans in Ohio
Jurisdiction Type Status Enacted Ends Pipeline campuses inside Source
Warren County
What it says
A resolution was adopted imposing a temporary moratorium for six months with periodic reviews every sixty days prohibiting the Warren County Building and Zoning Department from accepting any applications for Zoning, Building and Zoning permits and certifications for Data Centers or related uses in the five jurisdictions including Franklin, Harlan, Turtlecreek, Union and Washington Townships in Warren County Rural Zoning.From the adopted minutes. Vote: Unanimous
Moratorium In force Sept. 29, 2026 Not stated 0 Double-coded; government record Source ↗
Fayette County
What it says
Prohibited activities include any and all governmental actions which could result in the acceptance and processing of any application or petition for any type of permit, zoning, or building or land use approval for a data center or data processing center. No application for a data center or data processing center shall be accepted for filing or review or officially acted upon in any way during the moratorium period.From the adopted minutes
Moratorium In force Sept. 21, 2026 June 1, 2027 0 Double-coded; government record Source ↗
Ashville village
What it says
an ordinance imposing another 180-day moratorium on the receipt, processing, issuance, and approval of any application for a zoning certificate for any use related to data processing, hosting and related services (data centers) and declaring an emergency.From a news report
Moratorium End date passed; no outcome on record July 6, 2026 June 18, 2026 0 Double-coded; two or more independent news sources Source ↗
Dayton city
What it says
planning staff recommended prohibiting data centers within the City of Dayton, arguing that they represent inefficient use of limited industrial land and could negatively affect surrounding residential areas.From the adopted minutes. Vote: 4-0
Ban In force June 24, 2026 Not stated 0 Double-coded; official notice Source ↗
Butler County
What it says
It prohibits the "approval, establishment, or construction or the granting/issuance of any permit for any data center."From a news report. Vote: Unanimous
Moratorium In force June 16, 2026 Not stated 0 Double-coded; two or more independent news sources Source ↗
Niles city
What it says
AN ORDINANCE PLACING A TEMPORARY MORATORIUM, NOT TO EXCEED ONE HUNDRED AND EIGHTY (180) DAYS, ON THE GRANTING/ISSUING OF ANY NEW PERMITS, AS WELL AS THE RECEIPT AND PROCESSING OF APPLICATIONS FOR PERMITS, FOR DATA CENTERS WITHIN THE CORPORATE LIMITS OF THE CITY OF NILESFrom draft text; the adopted version may differ
Moratorium In force May 20, 2026 Nov. 20, 2026 0 Double-coded; government record Source ↗
Weathersfield township
What it says
a temporary moratorium of six (6) months is hereby imposed on the acceptance, processing, and approval of any applications, permits, zoning requests, variances, or approvalsFrom the adopted minutes
Moratorium End date passed; no outcome on record April 30, 2026 Oct. 30, 2026 0 Double-coded; government record Source ↗
Boardman township
What it says
a Resolution to enact a twelve-month moratorium on the receipt, processing, issuance, or approval of any application for a Zoning Certificate for a Data Center.From the adopted minutes
Moratorium In force April 28, 2026 Not stated 0 Double-coded; government record Source ↗
St. Albans township
What it says
The purpose of this public hearing is for proposed text amendment to Article 15, section 1502 of the Zoning Resolution to exclude data centers and related other information services. ... Mike Washington made a resolution adopting a text amendment to section 1502 (conditionally permitted uses) of the St. Albans Township Zoning Resolution.From the adopted minutes
Ban In force March 10, 2026 Not stated 0 Double-coded; government record Source ↗
Conneaut city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Defiance city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Granville village Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Grove City city Moratorium In force Nov. 3, 2026 Not stated 0 Government record; single-coded Source ↗
Hubbard city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Oregon city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Pataskala city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Sprigg township Moratorium In force Nov. 3, 2026 Not stated 0 Government record; single-coded Source ↗
Sunbury village Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Trenton city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Upper Sandusky city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Urbana city Ban In force Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Lake township Moratorium In force (extended) Oct. 26, 2026 April 27, 2027 0 News report; single-coded Source ↗
Delphos city Moratorium In force Oct. 5, 2026 Not stated 0 News report; single-coded Source ↗
McDonald village Moratorium In force Sept. 16, 2026 Not stated 0 Tracker lead only; not counted in any headline
Lima city Moratorium In force Sept. 14, 2026 Not stated 0 Tracker lead only; not counted in any headline
Pioneer village Moratorium In force Sept. 14, 2026 Not stated 0 News report; single-coded Source ↗
Warren city Moratorium In force Sept. 9, 2026 Not stated 0 Tracker lead only; not counted in any headline
Fairfield township Moratorium In force Sept. 8, 2026 Not stated 0 Tracker lead only; not counted in any headline
Northfield Center township Moratorium In force Sept. 8, 2026 Not stated 0 Tracker lead only; not counted in any headline
Westlake city Moratorium In force Sept. 3, 2026 Not stated 0 News report; single-coded Source ↗
Newton Falls village Moratorium In force Sept. 2, 2026 Not stated 0 News report; single-coded Source ↗
Defiance city Moratorium In force Sept. 1, 2026 Feb. 28, 2027 0 Tracker lead only; not counted in any headline
Miamisburg city Moratorium In force Sept. 1, 2026 Not stated 0 News report; single-coded Source ↗
Fairborn city Moratorium In force Aug. 17, 2026 Not stated 0 Tracker lead only; not counted in any headline
Jefferson village Moratorium In force Aug. 17, 2026 Not stated 0 Tracker lead only; not counted in any headline
Mount Gilead village Moratorium In force Aug. 17, 2026 Not stated 0 Tracker lead only; not counted in any headline
Athens city Moratorium In force Aug. 3, 2026 Not stated 0 News report; single-coded Source ↗
Athens township Moratorium In force Aug. 1, 2026 Aug. 1, 2027 0 News report; single-coded Source ↗
Perry township Moratorium In force July 28, 2026 Not stated 0 Tracker lead only; not counted in any headline
Buckeye Lake village Moratorium In force July 27, 2026 Not stated 0 Tracker lead only; not counted in any headline
Clearcreek township Moratorium In force July 27, 2026 Not stated 0 Tracker lead only; not counted in any headline
North Royalton city Moratorium In force July 21, 2026 Not stated 0 Tracker lead only; not counted in any headline
Clayton city Moratorium In force July 16, 2026 July 16, 2027 0 Tracker lead only; not counted in any headline
Green township Moratorium In force July 14, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Hudson city Moratorium In force July 14, 2026 Not stated 0 Tracker lead only; not counted in any headline
Springfield city Moratorium In force July 14, 2026 Not stated 2 Double-coded; not headline-eligible Source ↗
Jackson city Moratorium In force July 13, 2026 Not stated 0 Tracker lead only; not counted in any headline
Middlefield village Moratorium In force July 9, 2026 Not stated 0 Tracker lead only; not counted in any headline
Alliance city Moratorium In force July 6, 2026 Not stated 0 Tracker lead only; not counted in any headline
Aurora city Moratorium In force June 30, 2026 Not stated 0 Tracker lead only; not counted in any headline
Xenia city Moratorium In force June 25, 2026 Not stated 0 News report; single-coded Source ↗
Middleburg Heights city Moratorium In force June 23, 2026 Not stated 0 Tracker lead only; not counted in any headline
Avon Lake city Moratorium In force June 22, 2026 June 22, 2027 0 Tracker lead only; not counted in any headline
Broadview Heights city Moratorium In force June 22, 2026 Not stated 0 Tracker lead only; not counted in any headline
Mayfield village Moratorium In force June 22, 2026 Not stated 0 Tracker lead only; not counted in any headline
St. Marys city Moratorium In force June 22, 2026 June 22, 2027 0 News report; single-coded Source ↗
Wickliffe city Moratorium In force June 22, 2026 Not stated 0 Tracker lead only; not counted in any headline
Montgomery township Moratorium In force June 17, 2026 June 17, 2028 0 News report; single-coded Source ↗
Clinton village Moratorium In force June 16, 2026 Not stated 0 Tracker lead only; not counted in any headline
Berea city Moratorium In force June 15, 2026 Not stated 0 Tracker lead only; not counted in any headline
Ashtabula township Moratorium In force June 10, 2026 June 10, 2027 0 News report; single-coded Source ↗
Ellsworth township Moratorium In force June 10, 2026 June 10, 2027 0 News report; single-coded Source ↗
Howland township Moratorium In force June 10, 2026 Dec. 7, 2026 0 Tracker lead only; not counted in any headline
Bellevue city Moratorium In force June 8, 2026 Not stated 0 Tracker lead only; not counted in any headline
Geneva city Moratorium In force June 8, 2026 Not stated 0 Tracker lead only; not counted in any headline
North Perry village Moratorium In force June 4, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
North Perry village Moratorium In force June 4, 2026 Not stated 0 Tracker lead only; not counted in any headline
Braceville township Moratorium In force June 2, 2026 Nov. 29, 2026 0 Tracker lead only; not counted in any headline
Cortland city Moratorium In force June 1, 2026 June 1, 2027 0 Tracker lead only; not counted in any headline
Hubbard city Moratorium In force June 1, 2026 June 1, 2027 0 Tracker lead only; not counted in any headline
Madison township Moratorium In force May 28, 2026 Not stated 0 Tracker lead only; not counted in any headline
Carrollton village Moratorium In force May 27, 2026 Not stated 0 Tracker lead only; not counted in any headline
Hamilton township Moratorium In force May 20, 2026 May 20, 2027 0 Tracker lead only; not counted in any headline
New Franklin city Moratorium In force May 20, 2026 Not stated 0 News report; single-coded Source ↗
Grafton village Moratorium In force May 19, 2026 May 18, 2031 0 News report; single-coded Source ↗
North Ridgeville city Moratorium In force May 18, 2026 Not stated 0 Tracker lead only; not counted in any headline
Yellow Springs village Moratorium In force May 18, 2026 Not stated 0 News report; single-coded Source ↗
Bazetta township Moratorium In force May 12, 2026 Not stated 0 Tracker lead only; not counted in any headline
Jackson township Moratorium In force May 12, 2026 May 12, 2027 0 Government record; single-coded Source ↗
Painesville township Moratorium In force May 12, 2026 Not stated 0 Tracker lead only; not counted in any headline
South Point village Moratorium In force May 12, 2026 Not stated 0 Tracker lead only; not counted in any headline
Ontario city Moratorium In force May 6, 2026 Not stated 0 Tracker lead only; not counted in any headline
St. Clair township Moratorium In force May 5, 2026 Not stated 0 Tracker lead only; not counted in any headline
Bucyrus city Moratorium In force May 4, 2026 Not stated 0 Tracker lead only; not counted in any headline
Commercial Point village Moratorium In force May 4, 2026 Not stated 0 Tracker lead only; not counted in any headline
Lakeview village Moratorium In force May 4, 2026 Not stated 0 News report; single-coded Source ↗
Waynesville village Moratorium End date passed; no outcome on record May 4, 2026 Oct. 31, 2026 0 Tracker lead only; not counted in any headline
Carrollton village Moratorium In force April 27, 2026 Not stated 0 News report; single-coded Source ↗
Lake township Moratorium In force April 27, 2026 Not stated 0 Tracker lead only; not counted in any headline
Streetsboro city Moratorium In force April 27, 2026 Not stated 0 Tracker lead only; not counted in any headline
Findlay city Moratorium In force April 21, 2026 April 21, 2027 0 News report; single-coded Source ↗
Brimfield township Moratorium In force April 20, 2026 Not stated 0 Tracker lead only; not counted in any headline
Ravenna city Moratorium In force April 20, 2026 Not stated 0 Tracker lead only; not counted in any headline
Tiffin city Moratorium In force April 20, 2026 April 20, 2027 0 News report; single-coded Source ↗
Vandalia city Moratorium In force April 20, 2026 Not stated 0 Tracker lead only; not counted in any headline
Vermilion city Moratorium In force April 20, 2026 March 23, 2027 0 Tracker lead only; not counted in any headline
Washington township Moratorium End date passed; no outcome on record April 20, 2026 Sept. 5, 2026 1 Double-coded; not headline-eligible Source ↗
Washington township Moratorium In force April 20, 2026 Not stated 0 Tracker lead only; not counted in any headline
Kent city Moratorium In force April 15, 2026 Not stated 0 Tracker lead only; not counted in any headline
Prairie township Moratorium End date passed; no outcome on record April 15, 2026 Oct. 15, 2026 0 Tracker lead only; not counted in any headline
Providence township Moratorium In force April 15, 2026 Not stated 0 Tracker lead only; not counted in any headline
Avon city Moratorium In force April 14, 2026 April 14, 2027 0 Tracker lead only; not counted in any headline
Sunbury village Moratorium In force April 14, 2026 Jan. 31, 2027 0 News report; single-coded Source ↗
Twinsburg city Moratorium In force April 14, 2026 Not stated 0 Tracker lead only; not counted in any headline
Rittman city Moratorium In force April 13, 2026 Not stated 0 Tracker lead only; not counted in any headline
Shawnee township Moratorium In force April 13, 2026 Not stated 0 Tracker lead only; not counted in any headline
Tallmadge city Moratorium In force April 13, 2026 Not stated 0 Tracker lead only; not counted in any headline
Canton township Moratorium In force April 9, 2026 Not stated 0 Tracker lead only; not counted in any headline
Ada village Moratorium In force (extended) April 7, 2026 Sept. 1, 2027 0 Tracker lead only; not counted in any headline
Clay township Moratorium In force April 7, 2026 Not stated 0 Tracker lead only; not counted in any headline
Archbold village Moratorium In force (extended) April 6, 2026 April 6, 2027 0 News report; single-coded Source ↗
Washington township Moratorium In force April 6, 2026 Not stated 0 Tracker lead only; not counted in any headline
Trenton township Moratorium In force April 1, 2026 Not stated 0 Tracker lead only; not counted in any headline
Plain township Moratorium In force March 24, 2026 Not stated 0 Tracker lead only; not counted in any headline
Freedom township Moratorium In force March 19, 2026 Not stated 0 Tracker lead only; not counted in any headline
Wellington village Moratorium In force March 16, 2026 Not stated 0 Tracker lead only; not counted in any headline
Blanchester village Moratorium In force March 12, 2026 Not stated 0 News report; single-coded Source ↗
Williamsburg village Moratorium In force March 12, 2026 Not stated 0 Tracker lead only; not counted in any headline
Scioto township Moratorium In force March 5, 2026 Not stated 0 News report; single-coded Source ↗
Spencer township Moratorium In force March 5, 2026 Not stated 0 Tracker lead only; not counted in any headline
Vermilion township Moratorium In force March 4, 2026 Not stated 0 Tracker lead only; not counted in any headline
Lake township Moratorium In force March 3, 2026 March 3, 2027 0 News report; single-coded Source ↗
Mount Orab village Moratorium In force March 3, 2026 Not stated 0 News report; single-coded Source ↗
Richfield village Moratorium In force (extended) March 3, 2026 March 2, 2027 0 Tracker lead only; not counted in any headline
Urbana city Moratorium In force March 3, 2026 Not stated 0 News report; single-coded Source ↗
Jackson township Moratorium In force March 2, 2026 Not stated 0 Tracker lead only; not counted in any headline
Monroeville village Moratorium In force Feb. 24, 2026 Not stated 0 Tracker lead only; not counted in any headline
Pleasant township Moratorium In force Feb. 24, 2026 Not stated 0 Tracker lead only; not counted in any headline
Monclova township Moratorium In force Feb. 17, 2026 Feb. 17, 2027 0 Government record; single-coded Source ↗
New Carlisle city Moratorium In force Feb. 17, 2026 Not stated 0 Tracker lead only; not counted in any headline
Richfield township Moratorium In force Feb. 17, 2026 Not stated 0 Tracker lead only; not counted in any headline
Vienna township Moratorium End date passed; no outcome on record Feb. 17, 2026 Oct. 16, 2026 0 News report; single-coded Source ↗
Ironton city Moratorium In force Feb. 12, 2026 Not stated 0 Tracker lead only; not counted in any headline
Pierce township Moratorium In force (extended) Feb. 11, 2026 May 31, 2027 0 News report; single-coded Source ↗
Hubbard township Moratorium In force Feb. 10, 2026 Feb. 10, 2027 0 Tracker lead only; not counted in any headline
Maumee city Moratorium In force Feb. 2, 2026 Feb. 2, 2027 0 Tracker lead only; not counted in any headline
Muhlenberg township Moratorium In force Feb. 2, 2026 Not stated 0 News report; single-coded Source ↗
Williamsburg township Moratorium In force (extended) Jan. 26, 2026 Jan. 25, 2027 0 Tracker lead only; not counted in any headline
Waterville township Moratorium In force Dec. 17, 2025 Not stated 0 Tracker lead only; not counted in any headline
Norton city Moratorium End date passed; no outcome on record Dec. 1, 2025 Aug. 28, 2026 0 News report; single-coded Source ↗
Eastlake city Moratorium In force Nov. 25, 2025 Not stated 0 Tracker lead only; not counted in any headline
Boston Heights village Moratorium In force Nov. 12, 2025 Not stated 0 Tracker lead only; not counted in any headline
Barberton city Moratorium In force Nov. 10, 2025 Not stated 0 News report; single-coded Source ↗
Bridgewater township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Brooklyn city Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Freedom township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Henry township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Liberty township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Lordstown village Moratorium End date passed; no outcome on record Not stated July 4, 2026 0 Double-coded; not headline-eligible Source ↗
Monroe township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Morgan township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Northwest township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Plain township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Portage township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Shalersville township Moratorium End date passed; no outcome on record Not stated Nov. 1, 2026 0 Tracker lead only; not counted in any headline
St. Bernard village Moratorium In force Not stated Not stated 0 News report; single-coded Source ↗
Swan Creek township Moratorium End date passed; no outcome on record Not stated Nov. 5, 2026 0 Tracker lead only; not counted in any headline
Upper Sandusky city Moratorium In force Not stated Not stated 0 News report; single-coded Source ↗
Washington township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Weston township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Windham township Moratorium In force Not stated Not stated 0 Tracker lead only; not counted in any headline
Garrettsville village Moratorium Proposed Aug. 12, 2026 Not stated 0 News report; single-coded Source ↗
Plain City village Moratorium Vote scheduled Aug. 10, 2026 Aug. 10, 2027 0 News report; single-coded Source ↗
Willoughby city Moratorium Proposed July 14, 2026 Not stated 0 News report; single-coded Source ↗
Girard city Moratorium Vote scheduled July 13, 2026 July 13, 2027 0 Tracker lead only; not counted in any headline
Amherst city Moratorium Vote scheduled Not stated Not stated 0 Tracker lead only; not counted in any headline
Conneaut city Moratorium Proposed Not stated Not stated 0 News report; single-coded Source ↗
German township Moratorium Proposed Not stated Not stated 0 News report; single-coded Source ↗
Hartville village Moratorium Proposed Not stated Not stated 0 News report; single-coded Source ↗
Ohio Ban Proposed Not stated Not stated — Double-coded; not headline-eligible Source ↗
Perry village Moratorium Vote scheduled Not stated Not stated 0 Tracker lead only; not counted in any headline
Piqua city Ban Status not established Nov. 3, 2026 Not stated 0 Double-coded; not headline-eligible Source ↗
Chillicothe city Moratorium Lifted Aug. 24, 2026 Sept. 14, 2026 0 News report; single-coded Source ↗
Cleveland city Moratorium Status not established July 15, 2026 Oct. 20, 2026 0 Double-coded; not headline-eligible Source ↗
Massillon city Moratorium Status not established April 6, 2026 Aug. 14, 2026 0 Double-coded; not headline-eligible Source ↗
Cincinnati city Zoning overlay Status not established Feb. 11, 2026 May 11, 2026 0 Double-coded; not headline-eligible Source ↗
South Bloomfield village Moratorium Replaced by permanent rules Dec. 15, 2025 Not stated 0 Tracker lead only; not counted in any headline
Waterville city Moratorium Expired Dec. 8, 2025 Not stated 0 Tracker lead only; not counted in any headline
Jerome township Moratorium Replaced by permanent rules Sept. 3, 2025 May 31, 2026 0 Tracker lead only; not counted in any headline
Fairborn city Moratorium Expired Sept. 6, 2022 Not stated 0 Tracker lead only; not counted in any headline
Paris township Moratorium Replaced by permanent rules Not stated Not stated 0 Tracker lead only; not counted in any headline

* The ordinance has a conditional sunset trigger (for example, “remains in effect until permanent industrial zoning standards are adopted”); hover the asterisk for the ordinance text.

Ohio entitlement FAQ

How many active data center moratoriums are currently in force across Ohio?

As of Nov. 18, 2026, Ohio has 161 data center moratoriums or bans on record as in force, including 9 double-coded and confirmed by a government record, an official notice or two independent news outlets. 10 more are proposed or scheduled for a council vote, and 6 earlier pauses have expired or been replaced by permanent zoning rules. The list may be incomplete; nationally, a blind search found 83.7% of instruments already in the register.

Which planned Ohio data center campuses are affected by local permitting freezes?

2 of the in-force instruments have at least one planned data center project inside the boundary (county-wide reading). Projects under construction or operating aren't affected: they already hold their approvals. Whether a planned project is covered depends on the approvals it already holds and on the instrument's own scope; the table quotes the text where we have it.

For national benchmarks, source-tier definitions and statistical methodology, see the Moraine US Data Center Moratorium Register.