Guides
By · · Updated

CRE Due Diligence Checklist: 161 Items (Free PDF)

A 161-item CRE due diligence checklist: financial, lease, legal, physical, tenant and market, plus office, retail and industrial add-ons. Free PDF.

Six diligence workstreams test different risks. Use the categories together to build a complete acquisition review.
Editorial guide: Use the categories together to build a complete acquisition review.

The checklist I wish I had been handed on day one

I spent 10 years on the buy side, including five as Director of Research. Every acquisition starts with a checklist, and most checklists have gaps that someone learned about the hard way. This is a consolidated version, built around the document-heavy work Moraine’s platform now drafts for review.

161 items in six categories (financial, lease, legal, physical, tenant, market), plus office, retail and industrial add-ons. Use it as the master reference for any acquisition, whether you are checking a single asset before closing or running a 40-asset portfolio audit. The categorization matches how an institutional acquisitions team actually divides the work: the financial analyst owns financial DD, the asset manager owns lease and tenant, outside counsel owns legal, the engineer owns physical, and someone senior owns the market thesis. The checklist is structured so that each section can be handed to the right person without losing the cross-references that tie the file together.

What missing a single item costs: an overlooked environmental REC, an unnoticed co-tenancy provision, a missed renewal-option deadline buried in an amendment, a tenant default that was disclosed in a side letter but not the lease itself. Each of these is the kind of finding that, discovered post-closing, reduces realized return materially. The point of a checklist is to make sure these findings are surfaced in week 2 of diligence, not month 14 of asset management.


Financial Due Diligence

Financial due diligence verifies the property’s income, expenses, and investment viability. This is where most acquisition decisions are ultimately made or broken.

Income Verification

  • Rent roll: Current rent roll with tenant names, suite numbers, SF, lease dates, base rent, and escalations
  • Rent roll vs. lease comparison: Verify rent roll figures match actual lease terms
  • Gross potential rent: Calculate total rental income at full occupancy and market rates
  • Vacancy and credit loss: Current vacancy rate and historical collection loss
  • Other income: Parking, storage, antenna, signage, late fees, and other miscellaneous income
  • Percentage rent: Verify breakpoints and tenant sales reporting (retail properties)
  • Straight-line rent adjustments: Calculate GAAP straight-line rent for financial reporting
  • Trailing monthly rent rolls: Month-end rent rolls for the last 12 months, to show occupancy and in-place rent drift
  • Rent roll tie-out chain: Tie the rent roll to estoppels, the estoppels to bank deposits, and the deposits to the T-12

Operating Expenses

  • Trailing 12-month (T-12) operating statements: Obtain and review the most recent T-12
  • Multi-year operating statements: Collect 3–5 years of operating history for trend analysis
  • Expense reconciliations: CAM, tax, and insurance reconciliation statements
  • Real estate tax bills: Current and historical tax bills; check for pending reassessment
  • Insurance policies and premiums: Current coverage, claims history, premium trends
  • Utility costs: Verify utility expense allocation and any submetering
  • Management fees: Current management contract terms and fee structure
  • Capital expenditure history: CapEx spending over the past 3–5 years
  • Budget vs. actual: Reconcile each year’s budget to actuals and get an explanation for every material variance
  • Utility bills: 24 months of bills by meter, tied to the utility expense line
  • Insurance loss runs: Five years of carrier loss runs, plus premium history
  • Tax appeal analysis: Compare the assessment to comparable properties, check pending or recent appeals, and model the post-sale reassessment

Underwriting Analysis

  • Cap rate analysis: Calculate going-in cap rate based on verified NOI
  • NOI reconciliation: Reconcile seller’s NOI with your independently verified figures
  • Debt service coverage: Calculate DSCR based on proposed financing terms
  • Cash-on-cash return: Project year-one returns based on equity investment
  • IRR projections: Model internal rate of return over hold period
  • Sensitivity analysis: Stress-test assumptions for vacancy, rent growth, and expense escalation
  • Comparable sales: Recent comparable transactions for valuation benchmarking

Lease Due Diligence

Lease due diligence is the foundation of understanding any income-producing commercial property. Every tenant relationship, every dollar of revenue, and every obligation is defined in the lease documents.

Lease Document Collection

  • All executed leases: Collect original leases for every tenant
  • All amendments: Every amendment, modification, and extension in chronological order
  • Side letters: Any supplemental agreements outside the primary lease
  • Guaranty agreements: Personal or corporate guarantees
  • Commencement date agreements: Confirmed commencement and rent start dates
  • Estoppel certificates: Request and review tenant estoppels (see estoppel certificate guide)
  • SNDAs: Subordination, non-disturbance, and attornment agreements
  • Ground lease estoppel: If the site is ground leased, request an estoppel from the fee owner

Lease Abstract Review

  • Lease abstracts for all tenants: Completed abstracts covering all material terms (see our lease abstract template)
  • Rent schedules: Base rent, escalations, free rent, percentage rent for each tenant
  • Lease expiration schedule: Rollover profile by year showing SF and revenue at risk
  • Renewal options: Track all renewal options, notice deadlines, and rent reset mechanisms
  • Termination rights: Identify any kick-out clauses, co-tenancy termination rights, or go-dark provisions
  • Expansion options: ROFR, ROFO, and expansion option commitments
  • Assignment and subletting provisions: Restrictions and consent requirements
  • Exclusive use clauses: Exclusivity provisions that restrict future leasing
  • Operating expense recovery: Verify NNN, base year, or modified gross structures for each tenant
  • Pro-rata share and CAM treatment: Confirm each tenant’s pro-rata share or fixed CAM, and the denominator used
  • CAM audit rights and open claims: Identify tenant audit rights and any open audit claims or disputed reconciliations

Critical Date Analysis

  • Near-term expirations: Leases expiring within 12–24 months
  • Option exercise deadlines: Upcoming notice periods for renewal, termination, or expansion
  • Free rent burn-off dates: When abatement periods end
  • Rent escalation dates: Upcoming bumps and reset dates

Legal due diligence protects against title defects, regulatory violations, and undisclosed liabilities.

Title and Survey

  • Title commitment: Review the title commitment for exceptions, encumbrances, and requirements
  • Title exceptions: Examine each exception (easements, restrictions, encroachments) for material impact
  • Survey: Obtain or update ALTA/NSPS survey; compare to title exceptions
  • Encroachments: Identify any encroachments onto or from the property
  • Access and easements: Confirm legal access to public roads; review utility and access easements
  • Deed restrictions: Review any use restrictions, CC&Rs, or development limitations
  • Title policy endorsements: List the endorsements to request (access, survey, zoning, restrictions, and any that cure specific survey issues)
  • Chain of title: Review the chain of title as far back as the exception schedule indicates

Zoning and Entitlements

  • Zoning confirmation: Verify current zoning designation and permitted uses
  • Non-conforming use: Determine if any existing uses are legally non-conforming
  • Zoning compliance letter: Obtain from municipality if available
  • Conditional use permits: Review any CUPs, variances, or special exceptions
  • Building permits: Verify permits for all improvements and tenant build-outs
  • Certificate of occupancy: Confirm current CO for the building and each tenant space
  • Future development restrictions: Identify any overlay districts, historic designations, or pending zoning changes

Litigation and Liens

  • Pending litigation: Search for any lawsuits involving the property or owner entity
  • Mechanic’s liens: Check for any contractor or vendor liens
  • Tax liens: Verify no delinquent tax obligations
  • UCC filings: Review any personal property security interests
  • Judgments: Search for judgments against the property owner
  • Regulatory violations: Check for any open code violations or compliance orders

Contracts and Agreements

  • Service contracts: Review all property management, maintenance, and vendor contracts
  • Ground lease: If applicable, review ground lease terms, rent, and expiration
  • HOA/POA agreements: Homeowner or property owner association documents and assessments
  • License agreements: Antenna, signage, or other license agreements affecting the property
  • Commission agreements: Outstanding leasing commission obligations
  • Licenses and permits: Business licenses, signage permits and any operating licenses that must transfer or be reissued
  • Existing loan compliance: If assuming a loan, confirm compliance with the loan documents and the assumption conditions

Physical Due Diligence

Physical due diligence assesses the building’s condition, identifies deferred maintenance, and estimates future capital needs.

Environmental

  • Phase I ESA: Environmental Site Assessment per ASTM E1527-21
  • Phase II ESA: If Phase I identifies RECs, conduct soil and groundwater testing
  • Asbestos survey: Asbestos-containing material inspection report
  • Lead-based paint: Testing for pre-1978 buildings
  • Mold assessment: Indoor air quality and mold inspection
  • Radon testing: Especially for ground-floor or basement spaces
  • Underground storage tanks: UST records and removal documentation
  • Environmental compliance: Verify compliance with federal, state, and local environmental regulations
  • Flood zone determination: FEMA flood zone classification and insurance requirements
  • Phase I timing: Confirm the Phase I’s time-sensitive components fall within 180 days before closing
  • Prior use history: Historical Sanborn maps, aerial photographs and a regulatory database review
  • Wetlands: Wetlands screening or delineation where the site or surroundings suggest it

Building Condition

  • Property Condition Assessment (PCA): Comprehensive PCA per ASTM E2018
  • Roof inspection: Age, condition, remaining useful life, warranty status
  • HVAC assessment: Age, capacity, condition, maintenance records for all units
  • Electrical systems: Service capacity, panel condition, code compliance
  • Plumbing: Piping material, condition, known issues
  • Structural assessment: Foundation, framing, load-bearing elements
  • Elevator inspection: Maintenance records, modernization needs, code compliance
  • Fire protection: Sprinkler system, fire alarm, suppression, inspection records
  • Parking structure: Concrete condition, waterproofing, joint sealant status
  • ADA compliance: Accessibility assessment for common areas and tenant spaces

Capital Expenditure Planning

  • CapEx reserve estimate: Immediate repairs and replacement reserve projections
  • Deferred maintenance: Items requiring near-term attention (0–12 months)
  • Replacement schedule: Major systems replacement timeline (roof, HVAC, elevators, parking)
  • Tenant improvement needs: Anticipated TI costs for upcoming lease renewals or new leasing
  • Energy efficiency opportunities: LED lighting, HVAC upgrades, building envelope improvements

For automated CapEx analysis, see how Moraine generates automated CapEx summaries.


Tenant Due Diligence

Tenant quality determines the durability of a property’s cash flow. This section goes beyond lease terms to assess whether tenants can actually pay rent.

Tenant Credit Analysis

  • Financial statements: Request and review tenant financials (public or privately provided)
  • Credit reports: Business credit reports for each material tenant
  • Credit ratings: Moody’s, S&P, or Fitch ratings for rated tenants
  • Default probability: Calculate or obtain tenant default probability scores (see tenant credit scoring)
  • Payment history: Obtain aging reports showing rent payment timeliness
  • Security deposits and LOCs: Verify all security deposits and letters of credit on hand

Tenant Concentration and Risk

  • Revenue concentration: Identify tenants representing >10% of gross revenue
  • Industry concentration: Assess tenant mix by industry sector
  • Tenant financial health trends: Revenue growth, profitability, and leverage trends
  • Guarantor analysis: Assess financial strength of guarantors
  • Bankruptcy risk: Flag any tenants with public financial distress indicators
  • Tenant retention probability: Assess likelihood of renewal based on lease terms, market conditions, and tenant operations

For comprehensive tenant analysis, explore Moraine’s tenant credit scoring and credit analysis tools.


Market Due Diligence

Market analysis validates the property’s competitive position and growth potential.

Submarket Analysis

  • Market rent comps: Current asking and effective rents for comparable properties
  • Occupancy trends: Submarket occupancy rates and historical trends
  • Absorption data: Net absorption trends in the submarket
  • New supply pipeline: Properties under construction or planned that will compete
  • Rent growth projections: Broker forecasts and historical rent growth trends

Comparable Analysis

  • Sales comps: Recent comparable sales with cap rates, price per SF, and deal terms
  • Lease comps: Recent comparable leases supporting underwriting assumptions
  • Operating expense comps: Benchmark property expenses against comparable buildings

Location and Demographics

  • Transportation access: Proximity to highways, transit, airports
  • Employment drivers: Major employers and employment trends in the area
  • Population and income trends: Demographic data supporting tenant demand
  • Infrastructure projects: Planned public or private development that could impact the property

Asset-Class Add-Ons: Office, Retail and Industrial

The core checklist applies to every property. These items are the ones that move price for a specific asset class, so work the section that matches the deal on top of the six categories above.

Office

Office underwriting turns on tenant credit and lease rollover.

  • Concentration: Largest tenant, and top five tenants, as a share of NOI
  • WALT and rollover: Weighted average lease term and rollover by year
  • Unfunded TI: Tenant improvement obligations across all leases, and what is funded as of closing
  • Unfunded leasing commissions: Outstanding LC schedule by lease
  • Landlord vs. tenant capex: Which capital items each lease puts on the landlord
  • Building-standard vs. above-standard TI: What each tenant has and what it costs to replace
  • Sublease analysis: Share of the building that is subleased, and at what spread to the direct rent
  • Floor efficiency: Rentable-to-usable ratio and load factor, verified against measurement
  • Parking ratio: Actual vs. code-required vs. competitive set
  • Common areas and amenities: Lobby, restrooms, elevators, fitness and conference space against the competitive set

Retail

Retail leases carry clauses that can change the pro forma in a single sentence.

  • Co-tenancy matrix: Every opening and operating co-tenancy clause, and the modeled effect if a named co-tenant goes dark
  • Exclusives matrix: A complete list of exclusive-use rights so new leasing does not trigger a violation
  • Radius restrictions: Any tenant restricted from opening near the property, or the landlord restricted from leasing nearby
  • Operating covenants: Which tenants must stay open and which can go dark without breach
  • Kick-out rights: Sales thresholds, measurement periods and cure periods
  • Recapture rights: The landlord’s ability to recapture dark space
  • Sales reporting: Tenant sales, sales per SF trends and breakpoints for percentage-rent tenants
  • Signage rights: Pylon and monument panel assignments by lease
  • REA / OEA: Cross-easements, cost sharing and approval rights in multi-parcel centers
  • Parking field: Striping, lighting, curbing and ADA condition

Industrial

Industrial tenants buy on building specifications, so verify the specifications physically.

  • Clear height: Measured at multiple points, noting where it drops
  • Column spacing and clear span: Column-free loading bays and bay depth
  • Dock doors: Count, type (dock-high or drive-in), levelers, seals and shelters
  • Truck court and trailer parking: Depth, stall count and paving condition, checked against target tenant requirements
  • Rail access: Active siding, switch rights and railroad easements, if any
  • Power capacity: Amps, volts, phase and the upgrade path
  • Sprinkler design: ESFR or other design density and the rack heights it supports
  • Floor load and flatness: Slab thickness, load rating and FF/FL numbers where operations need them
  • Building conditioning: Heated only, partly conditioned or cold storage, and the office-to-warehouse ratio
  • Truck routes and outside storage: Designated truck routes, weight restrictions, and whether outside storage is permitted
  • Stormwater and environmental history: Stormwater permits, retention maintenance, prior industrial use, tank history and any enforcement

A Realistic Diligence Timeline

Institutional diligence on a multi-tenant property typically runs 30 to 60 days from PSA execution to the end of the contingency period. Single-tenant net lease deals can move faster; deals needing third-party consents or many estoppels run longer. Work the categories in parallel.

WeekWorkstreams
Week 1PSA executed. Order title, survey, Phase I, PCA and zoning letter. Distribute the data room request list. Send estoppels and SNDAs to tenants.
Week 2Parallel document review: counsel on leases, finance on the T-12 and rent roll, engineering on plans and specs. First site visit.
Week 3Title commitment, Phase I draft and PCA draft arrive. Tenant calls. Financial reconciliation findings circulate.
Week 4Title objections submitted. Phase II decision if RECs were found. Estoppels returning.
Weeks 5-6Negotiate price, indemnities and escrows against findings. Final estoppels and SNDAs. Loan documents.
Weeks 7-8Closing and funding.

The four items that are never optional, whatever the asset class: a title commitment with exception review, a Phase I ESA, a property condition assessment, and estoppels from every material tenant.

Data Room Structure That Keeps a Deal Team Moving

Seller data rooms arrive sparse or as a dump of unindexed files. Asking for this structure up front lets the team parallelize:

  1. Title and survey
  2. Zoning and entitlements
  3. Environmental (Phase I, Phase II, historical)
  4. Physical (PCA, plans, specs, warranties)
  5. Financial (T-12s, budgets, CAM reconciliations, utilities, taxes, insurance)
  6. Leases (current with amendments, expired, estoppels and SNDAs, tenant financials)
  7. Operations (service contracts, management agreements, licenses)
  8. Legal (litigation, corporate, compliance)
  9. Marketing materials (OM, brochures, renderings)

The data room request list below turns the checklist into a document-by-document request you can send the seller. For the document-level workflow, see data room due diligence.


Free CRE Due Diligence Checklist PDF

Both files are free and need no email.

For the rent roll the checklist asks for, see the rent roll template.


How Moraine Fits This Checklist

Working through this checklist by hand takes weeks, and most of the hours go to reading documents. Moraine drafts the document-level work for office, retail and industrial deals and links each finding to its source page. A qualified underwriter should still review open items and source conflicts before IC.

Checklist categoryWhat Moraine drafts from the uploaded documents
Lease abstraction and analysisLease abstracts, rent schedules, options and critical dates
Financial statement review (T-12, operating statements)Normalized operating statements and a source-linked DCF model
Tenant credit analysisLLM-estimated tenant credit scoring
Legal document screeningFindings from the uploaded lease and legal documents
Environmental and CapExCapital expense summary from uploaded reports
Red flag identificationFindings with page-level citations

Moraine does not replace physical inspections, surveys, title work or legal opinions, and it does not produce a finished IC memo. It drafts the document-intensive analysis that consumes most of the diligence hours.

For a full comparison of DD approaches, see our guide to the best commercial real estate due diligence software.


Frequently Asked Questions

What is a commercial real estate due diligence checklist?

A CRE due diligence checklist is a comprehensive list of items to investigate before acquiring a commercial property. It covers financial analysis, lease review, legal examination, physical inspection, tenant assessment, and market evaluation. Using a checklist ensures nothing is overlooked during the acquisition process.

How long does commercial real estate due diligence take?

Traditional due diligence typically takes 30–90 days depending on deal complexity. The document analysis portion (lease review, financial verification, tenant credit checks) often consumes 2–4 weeks. AI platforms like Moraine build a first-draft model from documents.

Who is responsible for due diligence in a CRE acquisition?

The buyer is primarily responsible, often supported by third-party consultants: attorneys (title and legal), engineers (PCA and environmental), and accountants or analysts (financial). AI platforms like Moraine can take on much of the document-intensive analyst workload, with a qualified underwriter still reviewing the output.

How is due diligence different for different property types?

The core checklist applies across property types, but emphasis shifts. Retail properties require more focus on co-tenancy, percentage rent, and exclusive use provisions. Industrial properties emphasize environmental and structural assessments. Multifamily focuses on unit-level rent analysis and regulatory compliance. Office properties prioritize lease rollover exposure and tenant credit.

Which due diligence items are never optional?

Four items apply to every asset class: a title commitment with exception review, a Phase I Environmental Site Assessment, a property condition assessment, and estoppels from every material tenant. If any of them produces a red flag, the deal usually changes shape: a price reduction, a seller indemnity, an escrow holdback, or termination. After those four, the lease-to-rent-roll reconciliation matters most, because if the rent roll does not tie to the leases the investment thesis may be invalid.

Do I need a survey for a commercial property purchase?

For almost any institutional deal, yes. Lenders typically require an ALTA/NSPS land title survey, and it is the way to confirm that the legal description matches the improvements, access easements are recorded and nothing encroaches. Some sponsors rely on an updated existing survey with an affidavit on small single-tenant deals, which carries more risk.

Can AI replace traditional due diligence?

AI accelerates and improves the document analysis components of due diligence, lease abstraction, financial review, tenant credit assessment, and red flag identification. Physical inspections, title examination, and legal opinions still require human professionals. Moraine automates what can be automated and provides structured data that supports the human judgment required for the rest.


Complete Your Due Diligence Faster

Stop spending weeks on document analysis. Moraine automates the most time-consuming elements of this checklist and delivers a first-draft model and source-linked findings.

Request a Demo →

FAQ

Frequently asked questions

What is a commercial real estate due diligence checklist?
A CRE due diligence checklist is a comprehensive list of items to investigate before acquiring a commercial property. It covers financial analysis, lease review, legal examination, physical inspection, tenant assessment, and market evaluation. Using a checklist ensures nothing is overlooked during the acquisition process.
How long does commercial real estate due diligence take?
Traditional due diligence typically takes 30–90 days depending on deal complexity. The document analysis portion, lease review, financial verification, tenant credit checks, often consumes 2–4 weeks. AI platforms like Moraine build a first-draft model from documents; an analyst reviews it before IC.
Who is responsible for due diligence in a CRE acquisition?
The buyer is primarily responsible, often supported by third-party consultants: attorneys (title and legal), engineers (PCA and environmental), and accountants or analysts (financial). AI platforms like Moraine can take on much of the document-intensive analyst workload, with a qualified underwriter still reviewing the output.
How is due diligence different for different property types?
The core checklist applies across property types, but emphasis shifts. Retail properties require more focus on co-tenancy, percentage rent, and exclusive use provisions. Industrial properties emphasize environmental and structural assessments. Multifamily focuses on unit-level rent analysis and regulatory compliance. Office properties prioritize lease rollover exposure and tenant credit.
Can AI replace traditional due diligence?
AI accelerates and improves the document analysis components of due diligence, lease abstraction, financial review, tenant credit assessment, and red flag identification. Physical inspections, title examination, and legal opinions still require human professionals. Moraine automates what can be automated and provides structured data that supports the human judgment required for the rest.
What belongs on a commercial real estate closing checklist?
The closing (or transaction) checklist covers the final mile after diligence: title commitment and survey sign-off, estoppels and SNDAs collected, loan documents, closing statement prorations (rent, CAM, taxes), deposit transfers, insurance binders, and entity resolutions. It is the execution counterpart to the diligence checklist above.
What is a due diligence fee, and how long is a typical period?
Some markets (notably North Carolina) use a non-refundable due diligence fee paid to the seller for the exclusive right to inspect; elsewhere the economics live in the deposit's go-hard schedule. Commercial diligence periods typically run 30-90 days, negotiated alongside financing contingencies.
How does land due diligence differ?
Land adds entitlement work: zoning verification, utility availability, environmental assessment (often Phase II), soil and survey work, and title exceptions like easements and mineral rights that matter more when you intend to build.
Which due diligence items are never optional?
Four items apply to every asset class: a title commitment with exception review, a Phase I Environmental Site Assessment, a property condition assessment, and estoppels from every material tenant. If any of them produces a red flag, the deal usually changes shape: a price reduction, a seller indemnity, an escrow holdback, or termination. After those four, the lease-to-rent-roll reconciliation matters most, because if the rent roll does not tie to the leases the investment thesis may be invalid.
Do I need a survey for a commercial property purchase?
For almost any institutional deal, yes. Lenders typically require an ALTA/NSPS land title survey, and it is the way to confirm that the legal description matches the improvements, access easements are recorded and nothing encroaches. Some sponsors rely on an updated existing survey with an affidavit on small single-tenant deals, which carries more risk.